Marketing Editorial Calendar Template

Four documents and four sheets that size the quarter against the stage actually capping your pipeline, then run the week on stage age.

Free download  ·  No account needed

Capacity Plan, Q1

Why the quarter was impossible in week one

Two writers, one editor, a designer at a fifth of a week. A fictional instruments manufacturer, Havelock.

StageOwnerTouch hours per pieceHours available per weekCapacity per week
BriefEditor3124.0
DraftTwo writers16402.5
EditEditor691.5
DesignDesigner, 0.2 FTE47.51.9 on 60% of pieces
ScheduleEditor0.5510.0

Nine hours. That is what was left of a full-time editor's week after twelve hours of brief writing, three of calendar admin and six of standing meetings. Six hours per piece against nine available is one and a half pieces a week, and it was the lowest number in the pipeline, so it was the pipeline.

Thirteen weeks at 1.5 is 19.5. The plan committed 24, drafts arrived at 2.5 a week, and the queue grew by one piece a week until March. Delivered 17, eleven of them on the promised date.

Havelock Instruments committed to 24 pieces last quarter and shipped 17, eleven of them on the date they were promised. The plan was not ambitious. It was arithmetically impossible in week one. The number that made it impossible was nine, the hours of actual editing left in a full-time editor's week after twelve hours of brief writing, three of calendar admin and six of standing meetings. Six hours of editing per piece against nine available is one and a half pieces a week.

Every editorial calendar template on page one is the same grid. Publish date, working title, type, channel, keyword, owner, status. None of them contains the number that decides whether the cadence holds, which is the throughput of the slowest stage. Two writers producing two and a half drafts a week into an editor who clears one and a half do not produce two and a half pieces a week. They produce one and a half, and a queue that grows for thirteen weeks.

So the pack measures your pipeline before it plans anything, names the constraint, and sizes the quarter to that number. It runs the week on stage age rather than the publish date, gives every outside dependency a request-by date, and reconciles the grid against what the content system actually says. It installs into the marketing workspace, beside the content brief pack, the keyword cluster map, the content repurposing pack and the rest of the template library.

The number, the quarter it buys, and the week that delivers it

The constraint moving after one change to who does what, the calendar with every dependency carrying a request-by date, and the weekly risk view read off stage age.

Capacity Plan

Same three people. One task moved off the constrained person, and the constraint moved with it.

StageQ1 hours per weekQ1 capacityQ2 hours per weekQ2 capacity
Brief12, editor4.03, editor reviews onlyfolded into draft
Draft40, two writers2.540, two writers2.0
Edit9, editor1.518, editor3.0
Design7.51.9 on 60%7.51.9 on 60%
Schedule510.0510.0
Pipelineconstraint: Edit1.5 per weekconstraint: Draft2.0 per week
Quartercommitted 24capacity 19.5committed 21capacity 26

Relieving a constraint moves it, and that is the useful part. Writers self-briefing costs them four hours a piece, so drafting falls from 2.5 to 2.0 and becomes the new lowest number. Which makes the next hiring conversation one line long: a writer, not a second editor.

Commitment is capacity minus a reserve minus ramp. The reserve is the 12% of last quarter that arrived unplanned, measured rather than the round 20% every article recommends. Ramp is the fourteen pieces already in flight at the boundary.

Calendar

Every dependency carries a lead time and a request-by date back-computed from the target date.

SlotPromisedStageDependencyLeadRequest bySentCMSAgrees
Q2-0221 AprPublishedLegal review5d8 Apr7 AprpublishYes
Q2-0328 AprPublishedCustomer quote10d14 Apr13 AprpublishYes
Q2-0619 MayScheduleDesign7d7 May7 MayfutureYes
Q2-0726 MayEditLegal review5d14 May13 MayfutureNo
Q2-099 JunDraftCustomer quote10d25 May22 MaydraftYes
Q2-1016 JunBriefLegal review5d4 Junnot yetnoneYes
Q2-H229 MayPublishedLegal review5d21 May19 MaypublishYes
Q2-X1cut 11 MayCutExpert interview21d19 MaynevernoneYes

Row four is the one worth having. The post is already in a scheduled state and will publish itself on 26 May, and the piece is still in edit with legal outstanding. It was going to go live unreviewed, exactly on time, and nothing in a status column would have shown it.

The last row was cut in a weekly review rather than missed at the end of June. A 21 day interview lead time against a target of 4 June made the date impossible the moment it was written down.

Pipeline by Stage

Risk is days in stage against that stage's own distribution from the register. Not the publish date.

PieceStageDays inMedianP90RiskDays to dateDecision
Q2-06 Cost of ownershipSchedule112On pace1Publishes tomorrow
Q2-07 Method validationEdit425Watch8Chase legal. Unschedule the post today
Q2-08 Column careDraft12712At risk15Swap with Q2-11 or take a held slot
Q2-09 Titration automationDraft8712Watch22Quote is the critical path. Confirm this week
Q2-10 Qualification packBrief525At risk29Unblock, or the 4 Jun legal request slips with it
Q2-13 Pipette calibrationOutside review20519Blocked-7Escalate today or cut and take the slot back
Q2-14 FTIR against RamanDesign1349At risk8Ship without the diagram or move to 9 Jun
Q2-11 BalancesBrief125On pace36Nothing needed

Every red row still has time on it. That is the entire reason the view reads stage age: overdue is a result, and a piece past the ninetieth percentile with fifteen days left is a decision somebody can still make.

Across the quarter, eight pieces crossed a ninetieth percentile and each was flagged a median of eleven days early. Five recovered, two swapped with ready pieces, one was cut. None was discovered at its date.

What's in the pack

01

Capacity Plan

Every stage with its touch hours, its available hours and its weekly capacity, the constraint named outright, and the quarter's number after the reserve and the ramp come out.

02

Capacity Method

How to get from a team to that number in an hour, including the subtraction nobody makes: what is left of a full-time editor's week once briefs, admin and standing meetings are taken out of it.

03

Calendar

The committed slots with two dates each, plus four fields on every dependency: what is needed, who owns it, their measured lead time, and the request-by date back-computed from the target.

04

Pipeline by Stage

The week, with days in stage read against that stage's own median and ninetieth percentile from your register. Four risk states, and every one of them arrives while there is still time to act.

05

Published Register

One row per piece with the stage-by-stage elapsed days, the returns and where they came from, and a slip cause that names a stage. Every other number in the space is derived from this sheet.

06

Workflow Definition and Editorial Policy

Stages with one owner and one testable exit condition each, the request-by mechanic for outside reviewers, and the standing decisions that otherwise get relitigated in every production meeting.

07

Slip Review

A full worked quarter: the plan that was impossible in week one, the three findings that changed it, and the same team going from a 46% on-time rate to 90% while committing to three fewer pieces.

How to use it

  1. 1

    Open in River, or take it blank

    Open the pack in River and send your publishing history, or download the Word documents and CSV sheets and fill them in yourself.

  2. 2

    Send the last two quarters

    Everything published with whatever stage dates exist, who owns each stage and how much of their week it really gets, and anything needing an owner outside the team.

  3. 3

    Read the constraint first

    One stage, one number, and the quarter that number buys. It is usually smaller than the last plan and it is the first one that has ever been true.

  4. 4

    Commit, then run the week

    Fill the calendar to that number with request-by dates on every dependency, then work the risk view on stage age rather than waiting for a date to pass.

Frequently asked questions

Is this template free?

Yes. The download is Word documents and CSV sheets, no account and no card. Edit with AI is the optional half: the agent measures your own pipeline, names the constraint and sizes the quarter. Every pack sits in the template library.

What makes this different from a calendar spreadsheet?

A spreadsheet holds dates. This holds the number that decides whether those dates are possible. Throughput is set by the slowest stage, so a pipeline with an editor clearing one and a half pieces a week carries 19 in a quarter no matter how many rows the grid has.

How do I know which stage is the constraint?

Divide each stage's available hours by the touch hours a piece takes there, then take the lowest number. It is almost never the writers. On most teams it is whoever reviews, because reviewing is the task that gets squeezed by everything else in that person's week.

Why not just flag pieces once they are overdue?

Because overdue is a result, not a warning. A piece eight days into a stage whose ninetieth percentile is five is beyond anything your pipeline has recovered, and its publish date is still three weeks away. That gap is where every recoverable slip lives.

Our delays always come from legal or a customer quote. Does that help?

That is what the request-by date is for. A five-day reviewer adds nine days to a piece when the request goes out two days before the date, and nothing when it goes out at the draft sixty per cent mark. The reviewer never got faster. The clock started earlier.

What does reconciling against the CMS mean?

Scheduled in a spreadsheet is a word somebody typed. WordPress carries a post status of publish, future, draft, pending or private, so the comparison is one field. Webflow items have no scheduled state at all.

What does Edit with AI actually do?

It signs you up, installs this pack as a private workspace, and starts on your history. Send an export of what you published, a screenshot of the old calendar, or just a list of promised dates against actual ones, and the capacity plan comes back filled.

Find out how many pieces your quarter holds

Take the Word documents and CSV sheets blank, or open this exact pack in River and send it the last two quarters of publishing history.

Edit with AI