Construction Daily Report
Who was on site, what got done, and what affected the work today
Project | [Project name and address] |
|---|---|
Project number | [Number] |
Report number | [Number] |
Date | [Day of the week, date] |
Contractor | [Company] |
Written by | [Name, title] |
Work hours | [Start time to end time] |
Fill this in before you leave the site each day, while the facts are fresh. Write what you saw and who said what, not opinions. Months later, when a delay, claim or question comes up, these reports may be the only record of what happened.
Weather
Conditions | Morning | Afternoon |
|---|---|---|
Sky and rain or snow | [Clear / rain / snow] | [Clear / rain / snow] |
Temperature | [°F] | [°F] |
Wind | [Calm / mph] | [Calm / mph] |
Ground | [Dry / wet / muddy / frozen] | [Dry / wet / muddy / frozen] |
Work lost to weather | [None / hours lost, which crews and which work] |
|---|
Workforce on site
Company or trade | Foreman | Workers | Hours | Work performed and area |
|---|---|---|---|---|
[Company, trade] | [Name] | [#] | [#] | [Wall framing, level 2 east] |
Total | [#] | [#] |
Work completed today
[Area or activity: what was done and how far along. For example: Level 2 east wall framing, about 80% complete]
[Work that started, finished or stopped today, and why it stopped]
Schedule status | [On schedule / ahead / behind by __ days] |
|---|
Equipment on site
Equipment | Owned or rented | Hours working | Hours idle | Notes |
|---|---|---|---|---|
[Scissor lift] | [Rented] | [6] | [2] | [Idle waiting on inspection] |
Materials delivered
Material and quantity | Supplier | Delivery ticket | Received by | Condition |
|---|---|---|---|---|
[Drywall, 120 sheets] | [Supplier] | [Ticket number] | [Name] | [Good / damaged: describe] |
Visitors, inspections and tests
Name | Company or agency | Purpose and result | Time in and out |
|---|---|---|---|
[Name] | [City building department] | [Rough electrical inspection: passed] | [9:15 to 9:50 am] |
Directions, extra work and open questions
Record any instruction that changes the work, any extra work done on a time and materials basis, and any question still waiting on the design team.
Type | Given by | What was said or done | Reference |
|---|---|---|---|
[Verbal direction / extra work / question] | [Name, company] | [Owner asked to move the kitchen outlet 12 inches left] | [RFI or change order number, or none yet] |
Safety
Safety talk topic and attendance | [Ladder use, 14 attended] |
|---|---|
Injuries, incidents or near misses | [None / describe and give the incident report number] |
Hazards found and corrected | [None / describe] |
Delays and problems
Problem | Cause | Effect on schedule or cost | Who was told and when |
|---|---|---|---|
[Waiting on door hardware] | [Late supplier delivery] | [Level 1 doors pushed back 1 day] | [Emailed project manager, 2:30 pm] |
A daily report is usually not the written notice a contract requires for a delay or extra cost. Send that notice separately, by the deadline in your contract.
Photos
Photo number or link | What it shows |
|---|---|
[Photo 1] | [Water in the level 1 elevator pit, north wall, 8:10 am] |
Plan for tomorrow
[Trade: planned work and area]
[Inspections, deliveries or crane lifts scheduled]
[Materials, answers or approvals still needed to keep working]
Sign-off
Role | Name | Signature | Date |
|---|---|---|---|
Written by | [Name] | [Signature] | [Date] |
Reviewed by | [Project manager's name] | [Signature] | [Date] |